Central Plains Water – Stage 1 Location: Waikirikiri / Selwyn, NZ Time: 2020 Project Overview The Central Plains Water (CPW) Stage 1 project comprises approximately 17 km of open canal, with underground laterals supplying member farms near Hororata. The project enables Rakaia River water to be transferred to the Waikirikiri / Selwyn River system, helping replenish the river when flows are low. Our Role Taurus Engineering was involved in Stage 1, providing materials and engineering and fabrication support for the project. Our work included the design and construction of walkways and a monorail, fabrication and installation of building structures, and pipe services.