Turnkey Solution for Sika Christchurch Job number #16014 Location: Christchurch, NZ Time: October 2024 – March 2025 Taurus was engaged by Sika Christchurch to deliver a comprehensive turnkey solution, covering the design, fabrication, and installation of multiple components. At the core of this project was the mixing tank, designed and integrated with supporting structures and process systems to ensure optimal functionality. Our scope of work included: Designing: To meet all legislative requirements for health and safety, safe operation, and design best practices/standards, including mechanical, structural, electrical, automation and process pipe flow systems. Fabricating and Installing: a mezzanine platform with handrails, product platforms with load cells, and a crane hoist and crane structure. Manufacturing and Integrating: the mixing tank with process pipework, pumps, and valves, including electrical systems and full automation—thanks to Millennium Electrical. Installing key operational elements, including a scrubber unit, pallet swing gate, and water tanks. The project is currently underway, with work progressing towards a fully integrated system that meets Sika Christchurch’s operational needs.