Woolston Additive Line

#16205

Location: Christchurch, NZ

Time: May 2025 – present

Background: 

A busy fuel facility in Woolston required a new additive line system to streamline operations and improve efficiency. The project called for a custom-built solution developed in collaboration with the client and design engineer to deliver a semi-automated system that ensures both efficient and safe operation. 

Solution: 

Our team began with a site measure before developing and supplying detailed shop drawings for approval. Once approved, fabrication commenced in our Christchurch workshop. 

The scope of work included: 

  • Supply and installation of all valves 
  • Fabrication of pipeline components and site run pipework 
  • Delivery of full QA documentation 
  • Commissioning support 

The additive line was assembled using threaded and DK-Lok fittings to ensure accuracy, reliability, and ease of installation. Welding was limited to the stand fabrication, which was completed to the highest standards by our certified team.