Chemical processing plant installation Location: Christchurch, NZ Schedule: 2021-2022 Taurus installed two storage tanks in 2021, It involved pipe work, mechanical installation and upgrade. After installation, Taurus has been involved with daily checking and maintenance. Any breakdowns and repairs were dealt with by our competent staff, all of whom are fully trained and certified to a high standard. In undertaking this project, all repairs had to be completed within a tight deadline. Our staff also had to ensure they had met all the required procedures and had obtained all the necessary permissions.