Chemical wash plant installation and upgrade Location: Christchurch, NZ Year: 2017 / 2022 Taurus was contracted to fabricate and install a wash plant for cleaning parts of jet engines that Vortex designed at an existing facility in 2017. The challenge was to create a functional and efficient wash plant without disrupting ongoing operations. Using their extensive experience and expertise, Taurus successfully installed the wash plant, which met all specifications and exceeded client expectations. The plant has been in operation since its installation and has demonstrated excellent performance, effectively cleaning parts of jet engines with minimal downtime. In 2022, Taurus was again called upon to upgrade the chemical wash plant facility to further enhance its efficiency and productivity. The project is ongoing, with the Taurus team working closely with the client to ensure minimal disruption to operations during the upgrade process.