Christchurch Convention Centre

Location: Christchurch, New Zealand 
Schedule: 2019 – 2022 

Taurus is proud of its involvement in one of the most iconic Christchurch buildings of the post-quake rebuild. It worked at the new Christchurch Convention Centre (known as Te Pae) from when it started in late 2017, through to its completion in December 2021.

Taurus Engineering fabricated many types of steelworks for the building from the facades to pile casings, balustrades to heater trenches. A team was always on site throughout the build. It also had a constructive relationship with CPB Contractors. 

 As a result of its work there it won the Civic category at the New Zealand Commercial Projects Awards, hosted by Master Builders.  

 

*Photo credit: Te Pae Christchurch Contention Centre.

A visualisation of the Te Pae Christchurch Convention Centre
A outside visualisation of Te Pae, the Christchurch Convention Centre
A visualisation of the inside of Te Pae, the Christchurch Convention Centre
A visualisation of part of the outside of Te Pae the Christchurch Convention Centre