Kaiapoi Stormwater & Flooding Improvements

Location: Kaiapoi, NZ

Schedule: 2021 – 2022

Job number #2021 & 2696

Taurus Engineering fabricated the manifolds and pipe work for Otaki Street and Beach Road pumpstations in Kaiapoi, Waimakariri District. This was the first phase, and the main one, of the storm water and flooding improvements project projected to cost $18 million.  

The aim is that the construction of pump stations and associated infrastructure will improve drainage and reduce the impact of flooding on urban and rural properties in Kaiapoi. 

Map of work pictured
View of site with work happening
Location of some parts installed at Kaiapoi Wastewater pump station
Birdseye view of Kaiapoi wastewater pump station
Workmen on site at the Kaiapoi wastewater pump station
Pipework installed by Taurus at the Kaiapoi pump station
Pipe work being installed by Taurus at the Kaiapoi pumpstation