Pipe Bridge for Water Reticulation Project Job number: 16005 Location: Canterbury, New Zealand Time: Sep 2024 In September 2024, Taurus undertook the fabrication of a pipe bridge for water reticulation. The bridge spans a total length of 70 metres. Two months later, Taurus completed the fabrication as scheduled. To ensure the safe transportation of the bridge, Taurus divided the completed bridge into three sections and carried out the delivery at night. https://tauruseng.co.nz/wp-content/uploads/2025/01/Pipe-Bridge-v2.0.mp4