Turnkey Solution for Sika Christchurch

Job number #16014

Location: Christchurch, NZ

Time: October 2024 – March 2025

Taurus was engaged by Sika Christchurch to deliver a comprehensive turnkey solution, covering the design, fabrication, and installation of multiple components. At the core of this project was the mixing tank, designed and integrated with supporting structures and process systems to ensure optimal functionality.

Our scope of work included: 

  • Designing: To meet all legislative requirements for health and safety, safe operation, and design best practices/standards, including mechanical, structural, electrical, automation and process pipe flow systems. 
  • Fabricating and Installing: a mezzanine platform with handrails, product platforms with load cells, and a crane hoist and crane structure. 
  • Manufacturing and Integrating: the mixing tank with process pipework, pumps, and valves, including electrical systems and full automation—thanks to Millennium Electrical. 
  • Installing key operational elements, including a scrubber unit, pallet swing gate, and water tanks. 

The project is now completed and was successfully installed at the end of May 2025. 

At the top of the page, you’ll find our latest video showcasing behind the scenes where project manager Matthew Hansen takes you through the full project from fabrication to on-site installation.

 

 

image of mixing tank
mixing tank on crane in workshop
mixing tank fabrication process
fabrication of mixing tank
mixing tank fabrication
Sika mixing tank fabrication
mixing tank is worked on on it's side
final parts added to mixing tank