WESP upgrade at Ingleburn Location: Ingleburn, NSW, Australia Time: December 2025 – present #16313 Taurus was engaged by its sister company Fowlerex to fabricate a new Wet Electrostatic Precipitator (WESP) system at a major NSW building materials manufacturing facility in Ingleburn. The project forms part of the client’s commitment to reducing air emissions and improving environmental performance, upgrading it’s existing emission control infrastructure to meet strict environmental licence limits and support future capacity growth. The system has been engineered to significantly enhance particulate and gaseous emission control while integrating into the existing plant and stack arrangement. Scope of work six stainless steel Wet Electrostatic precipitator modules Slide gates Dampers All fabrication works are being carried out in accordance with project specifications, quality assurance requirements and NSW EPA Licence 13087 compliance standards. The project is progressing well, with the team now moving onto the fabrication of the WESPs.