Woolston Additive Line #16205 Location: Christchurch, NZ Time: May 2025 – present Background: A busy fuel facility in Woolston required a new additive line system to streamline operations and improve efficiency. The project called for a custom-built solution developed in collaboration with the client and design engineer to deliver a semi-automated system that ensures both efficient and safe operation. Solution: Our team began with a site measure before developing and supplying detailed shop drawings for approval. Once approved, fabrication commenced in our Christchurch workshop. The scope of work included: Supply and installation of all valves Fabrication of pipeline components and site run pipework Delivery of full QA documentation Commissioning support The additive line was assembled using threaded and DK-Lok fittings to ensure accuracy, reliability, and ease of installation. Welding was limited to the stand fabrication, which was completed to the highest standards by our certified team.