Job number #15950 Taurus recently completed a project for Citycare, this was the removal of an old diesel pipe and pipe replacement – providing a more robust and long-lasting solution for our client. The project involved several key stages, starting with radar detection to accurately locate the trench pathway between the tank and the building. Once excavated, our team carefully removed the old pipeline from the pump house before installing the new system and conducting comprehensive pressure tests. Our team maintained strict quality control throughout every step, to ensure a reliable, safety tested and durable product and service. The upgrade enhances the system’s longevity and efficiency for long-term use of the diesel pipes. We appreciate Citycare’s trust in us and look forward to delivering quality engineering services to more clients in the future.