Job number #16014
Location: Christchurch, NZ
Time: October 2024 – March 2025
Taurus was engaged by Sika Christchurch to deliver a comprehensive turnkey solution, covering the design, fabrication, and installation of multiple components. At the core of this project was the mixing tank, designed and integrated with supporting structures and process systems to ensure optimal functionality.
Our scope of work included:
The project is currently underway, with work progressing towards a fully integrated system that meets Sika Christchurch’s operational needs.
Posted in
Location: Lyttelton, NZ
Schedule: 2020-2021
In 2020, Taurus Engineering executed the Lyttleton to Woolston pipeline upgrade, which required 1.2 km of 150mm HD steel buried pipeline and valves. Taurus worked with various partners to complete the project in 2021.
Among the challenges that had to be overcome were: traffic management; public safety; and the protection of council assets that were buried under ground.
Year: 2017 / 2022
Taurus was contracted to fabricate and install a wash plant for cleaning parts of jet engines that Vortex designed at an existing facility in 2017. The challenge was to create a functional and efficient wash plant without disrupting ongoing operations.
Using their extensive experience and expertise, Taurus successfully installed the wash plant, which met all specifications and exceeded client expectations. The plant has been in operation since its installation and has demonstrated excellent performance, effectively cleaning parts of jet engines with minimal downtime.
In 2022, Taurus was again called upon to upgrade the chemical wash plant facility to further enhance its efficiency and productivity. The project is ongoing, with the Taurus team working closely with the client to ensure minimal disruption to operations during the upgrade process.
Schedule: 2021-2022
Taurus installed two storage tanks in 2021, It involved pipe work, mechanical installation and upgrade.
After installation, Taurus has been involved with daily checking and maintenance. Any breakdowns and repairs were dealt with by our competent staff, all of whom are fully trained and certified to a high standard.
In undertaking this project, all repairs had to be completed within a tight deadline. Our staff also had to ensure they had met all the required procedures and had obtained all the necessary permissions.
Location: Lyttelton, New Zealand
Schedule: 2022
Taurus has also worked on the Lyttleton Tank upgrade in 2022, supplying all the required pipe work and mechanical services.
One of Taurus’ main attributes is that it always overcomes challenges. Other qualities include: always supplying quality products, and its emphasis on safety.