Christchurch Arts Centre Location: Christchurch, New Zealand Schedule: 2019 – 2023 Taurus supplied and installed structural steel works as part of the re-strengthening project for Christchurch Art Centre’s F & B blocks throughout 2019-2022. (F block is completed and B block is still on going.) The Observatory Hotel is also complete.