Boiler Stack Fabrication for a Recycling Plant Location: Christchurch, NZ Schedule: 2021 In 2021, our team had the opportunity to work on a boiler stack fabrication project for a recycling plant located in Christchurch, New Zealand. The project involved fabricating and welding a 6mm 1800 JD boiler stack, which was made out of 600NB SC4 10 316 pipe. Our team was able to complete the project on schedule and ensure that the final product met all necessary specifications and standards. The finished boiler stack was installed and is now in use at the client’s recycling plant in Christchurch. We take pride in delivering quality workmanship and meeting the unique needs of our clients. This project was no exception, and we are pleased to have played a role in supporting the client’s operations and commitment to sustainability.”